Current data on Bahir Dar, Woldia, Dessie and Afar. Columnist Messay Mekonnen in current companies. The District contains a young jungle gymnasium, a library and a parking area that can force 150 vehicles at a time. The reconstruction of the remarkable structure also incorporates the popular Lobby Theater Lobby, Mazegaja Theater, located in the premises with prominent rates, with the limit of those who are forcing 830 individuals.
The Alec Construction Company based in Dubai, which was dedicated to the recovery of the prime minister's office, is splinters in this reconstruction. Despite the fact that this task was based on being completely finished and used in September 2021, it is being delayed with only 67% finish.
In the same way, the people of the City House visited the development of the ADWA Memorial Center Zero Kilometer project, completed in a sum of 12 hectares of land, at a total cost of 4.6 billion BIRR. The company consists of a historic center, a conference center with an exit limit of more than 2000 individuals.
While maintaining the first plan and the provisions of the impeccable structure, the company is presenting and merging new and high expectations, Stressed Meresa. Three more modest assembly rooms with a limit of 400 individuals, a parking with capacity to force 600 vehicles, a film, theater, library, exercise center, cafes and a nursery community.
- Category
- Sample Category #1