What happen in mekele

ow
1,561 Views
Published

The Ministry of Water, Irrigation and Energy, Dr. Seleshi Bekele has declared today that two basic points of sale (BO) of the Renaissance Dam of Great Ethiopia (GERD) have been completed and operative.

 

The base points give the arrival of water to the downstream nations, have been completed and put into operation, he said. As the Minister indicates, the two Bos have a limit to go through the entire Annual Abbay current in one year, give affirmations of the progression of water to the downstream nations at any time in the meddlesome water.

 

Dr. Seleshi said that Gerd eliminates the dangers of flooding in Sudan like the one that happened last season, saved from water in the flood fields and the prey is not a concern for hurting. GERD is scheduled to be planned as filling and development are equal, built as an excellent current and avant-garde office. "Dr. Seleshi noticed.

 

The minister further expressed that the other 13 points of sale are under development, which adds a gigantic limit of water discharge. In any valuable season, BOS will ensure that the current downstream while filling occurs when the input exceeds the output of the repository.

Category
Sample Category #1
Commenting disabled.